Hi, trying to create a job stream with 2 steps, 2nd step being a journalization for a given subledger (AR, say), and 1st step being a retrieval of either the system date, or a valid entry date on the system control. I tried using the view audit log option on the systemclosingcontrol business class, hoping it would populate the fields, and it has not done so (the 2nd step runs and reports that the parameter is not filled/populated). Any way to do this in job console? I know there are substitution values in certain calendar prompts, is there a neat way to do it in job console?