Since the daylight savings switch occurred it appears our invoicing is not running the same day as our items are shipped. These run from a scheduled job and appear to be running at 23:00 but the results are showing different.
Is there a way I can see what time the system thinks it is?
How do I make sure the time zone is correct?
TIA