Hello !
In our manufacturing order, we use raw material (setup in MMS002 : Manual allocation - on Picking list). This raw material is managed with lot N. (MMS001 : In lot Master - Manual entry)
This raw material is linked on an fabrication operation we always declare.
When we declare the MO to allocate the good lot of raw material and when we produced more than the M.O.'s qty, the quantity of raw material is not recalculated according to the quantity of parts declared on the operation. We allocate the raw mat in MMS121 and we have the quantity to be allocated in field M3TRQT
Do you know this issue ? Is someone found a solution ?
Thanks !!
isabelle