I want to add an extra material to several bills of material. In particular, I need to add another material to all bills of material which contain a certain material.
So if the requirement includes part_ID '046520' then insert part_ID '000580' where the work order type is a master or a workorder
Does anyone have a Sequel Query which will do the job or that I can modify to do the job?
Thanks