Hello Everyone,
We upgraded to Visual 8 this past year, but we've had a cost imploding issue for the better part of 5 years now. I was hoping someone might be able to shed light on why this is happening:
We try to implode costs once a month or once every two months, but every time we do, Visual resets our Consumable cost as well, and adds it into the Engineering Master. These Consumables are set up as Consumables, but every single implode, Visual brings those costs over (from their respective Purchase Orders) and throws them onto the BOM. This makes a final product look like it should cost $10,000.00 when in reality, it only costs $80.00. We must have something set up incorrectly with these parts, but we are unable to figure out what that is. Does anyone have any ideas?
Thank you,
Jessica