Hi All,
I posted the below in the Hansen 8 community but I thought I would also post here to see if anyone in development was aware of possible options
Our business is in need of an integrated scheduling tool for IPS, due to the current limitations of the existing scheduling tool (see enhacment request for details and please vote so IPS will update their tool).
Resource - Scheduling - Schedule Calendar
Was wondering if anyone has already integrated a scheduling tool to IPS and could share?
We are looking for a scheduling tool that
- Provides an 6-8 week look ahead
- can be scheduled by multiple users
- can filter schedule based on
- Responsibility
- Assignee
- Resource Pool
- Usage Group
- Provides a graphical representation of the schedule and resource loading