Hi,
Does anyone know if there (or where) is possibility to setup prevent overreporting regards to qty in the manufacturing order?
I've found only one settings in the PMS120/F connected with the order type, but this settings allow us to report in the first operation more pcs which acually was planned in the MO.

For example, I have MO released for 2 pcs, currently even I've "tick" the over reporting as an option in PMS120, M3 allow me to report more than two pcs (of course I will receive alert, but I still will be able to do this) . In my case I would like report max 2 pcs, exactly the same as was scheduled in MO and block possibility to overreporting for all operation in the routing.
Maybe somebody can help me with this?