When we perform a company copy in M3 (for example, PRD 100 → TRN 100), do we need to perform an initial data load for all tables? Sometimes we notice inconsistencies between M3 and the data in our replicated database.
We are using M3 Data Streaming along with Data Fabric pipelines to replicate the data, so I wanted to confirm the best practice in this scenario. If an initial load is required, should it come from EVS002, or would the Data Fabric pipelines initial load alone be sufficient?