SyteLine 8.03: How can we preserve actual job costs through inventory and customer shipment?
We use SyteLine 8.03 to manufacture upholstered furniture and pillows to specific sold customer orders. The same finished item number can have different fabric costs on different jobs.
Completed items remain in inventory until the entire customer order is ready to ship. We need each shipment’s COGS to reflect the actual cost of the job that produced those pieces.
Our example item has these settings:
- Cost Type: Actual
- Cost Method: Specific
- Warehouse/location: MAIN / STOCK
- Lot tracking: Not enabled
We noticed that completing a job at a different cost appears to change the cost of other pieces of the same item already in STOCK. The difference posts to Inventory Adjustment.
For example, existing stock was valued at approximately $113.99 per piece. After another job was completed at approximately $74.41 per piece, subsequent shipments used the lower cost. An Inventory Adjustment debit of approximately $1,345.68 also posted.
This makes it difficult to determine the correct margin for each customer order.
Could someone familiar with version 8.03 help us understand:
- Does Actual/Specific costing without lot tracking keep one cost for all pieces of an item in the same location, rather than a separate cost for each job?
- What supported setup would preserve each job’s actual cost through completion, inventory storage, and customer shipment? Would job-specific lots be appropriate, or is there another method?
- How should “Costs Based on Complete,” operation completion, and “Close Job” be handled? We want to understand when the finished item receives its final actual cost and what happens if additional costs post afterward.
- Does linking a customer order line to a job control which inventory cost is used at shipment, or must the correct lot/location also be selected?
- Which reports or transaction records should we use to reconcile job costs, finished inventory, COGS, and Inventory Adjustment?
We are looking for the correct setup and transaction process, rather than only a manual accounting adjustment. Any version 8.03 documentation or practical examples would be appreciated.
Thanks!