Originally posted by Ted Mech
We're trying to stack multiple events in the Advanced Scheduler for a PROTOCOL:upoc thread. The events are set up on independent schedules but seem to run together: the 1st in the stack will run on the schedule set for the 2nd. After bouning the process, sometimes the 2nd event will run, either on the 1st schedule or on its own. The events are spaced & the proocessing is limitedso that the schedules don't overlap.
How do I get each event to run, as scheduled, so that I can use a single thread to handle multiple scheduled events?