Originally posted by Rich Durkee
Our production Engine will need to be down for 6+ hours. We still have the old Siemens SNA/PU/LU connection. I was wondering how difficult it would be to create a new site on our test Engine with just the most critical threads, one of them being Siemens ADT. If I did this I would have to define the production LinkStation/DLC/PU/LU on the test system. Does anyone think that it is possible to do that and actually get the connection going in less time that the downtime? It doesn't seem like it should be that difficult but SNA is tricky.