infor.com
concierge
infor u
developer portal
documentation central
customer center
Posts
Categories
Groups
ERPs
CSD
FSM/HRT
LN
M3
Syteline/ CSI
Hubs
Developer
Healthcare
Hospitality
Public Sector
Onboarding
Release Center
CloudSuites
Aerospace & Defense (LN)
Automotive (LN)
Chemicals (M3)
Corporate (FSM/HRT)
Distribution (Sx.e/CSD)
Distribution Enterprise (M3)
Engineering & Construction (LN)
Fashion (M3)
Food & Beverage (M3)
Healthcare (FSM/HRT)
Industrial (Syteline/CSI)
Industrial Enterprise (LN)
Manufacturing (M3)
Public Sector (FSM/HRT)
Solutions
Supply Chain Management (SCM)
Human Capital Management (HCM)
Events
Groups
User Groups
Your Groups
About
Email Community Support
Infor News
Migrated Forums
Home
Clovertech
Clovertech Archive
Read Only Archives
Cloverleaf
Operating Systems
Red Hat ES 5.4
Jim (Clovertech)
Is CL 5.7 in the process or has it been certified to run with RedHat ES 5.4, 5.3 or 5.2. We are currently planning the upgrade to CL 5.7 and found that the earliest version of RH ES we can download is 5.2.
Find more posts tagged with
Clovertech
Comments
Max Drown
Cloverleaf 5.7 is certified for RedHat 5.2 but not beyond that yet. There should be a list of certified OS's and patch levels in the documentation.
Jim (Clovertech)
Thank you Max but the release notes state the following;
Cloverleaf
Max Drown
I'm with Healthvision, but still very new. ES 5.1 is indeed the latest certified release, I checked the documentation as well. Send an email to
techsupport@healthvision.com
to get the official word.
Jim (Clovertech)
Thank you Max, guess I should have looked a little closer at the location listed in your message. By the way congrats.
Jim
david_barr
We're working on upgrading from 5.7 to 5.8. Because they are certified for different versions of Linux, it seems that Cloverleaf and Linux can't be upgraded independently.
In other words, if we upgrade Linux from RH 5.1 to RH 5.4, Cloverleaf 5.7 might stop working. Is there a way around this? It would be nice to be able to have the upgraded 5.8 sites staged on the same server as our current 5.7 production, then we would only have to stop the 5.7 and start the 5.8. Having to schedule a Linux upgrade will lengthen the downtime when we do the upgrade. Other than having a new server to swap in for our production server, what's the best way of doing this?