Originally posted by Nora Katz
I am working on an interface where the sending system is producing an ADT and ORM message, and the receiving system only wants the ORM message (with insurance information).
Upon receipt of ADT, I was planning to save off the IN1 segments in a SQlite database and when I get the ORM message, insert the IN1 segments into the ORM message.
Has anyone done this in the past? Is this the best way of doing this?
Can I save the entire IN1 segment and insert it back into the message from an Xlate? Or, do I need to save the individual fields of the IN1 segment in the SQlite database?
ADT and ORM messages should come close together, but ORM only contains a single test, so, I will be saving the IN1 segments from the ADT messages for about 1 week and deletig them.
Any suggestions would be appreciated!
thanks