infor.com
concierge
infor u
developer portal
documentation central
customer center
Posts
Categories
Groups
ERPs
CSD
FSM/HRT
LN
M3
Syteline/ CSI
Hubs
Developer
Healthcare
Hospitality
Public Sector
Onboarding
Release Center
CloudSuites
Aerospace & Defense (LN)
Automotive (LN)
Chemicals (M3)
Corporate (FSM/HRT)
Distribution (Sx.e/CSD)
Distribution Enterprise (M3)
Engineering & Construction (LN)
Fashion (M3)
Food & Beverage (M3)
Healthcare (FSM/HRT)
Industrial (Syteline/CSI)
Industrial Enterprise (LN)
Manufacturing (M3)
Public Sector (FSM/HRT)
Solutions
Supply Chain Management (SCM)
Human Capital Management (HCM)
Events
Groups
User Groups
Your Groups
About
Email Community Support
Infor News
Migrated Forums
Home
Clovertech
Clovertech Archive
Read Only Archives
Cloverleaf
Cloverleaf
Infor Cloverleaf Integration Services 6.1.2 now available
Rob Abbott
Infor Cloverleaf Integration Services 6.1.2 now available
The Infor Cloverleaf Integration Development and Product Management Teams are pleased to announce Infor Cloverleaf Integration Services 6.1.2. This release
Find more posts tagged with
Clovertech
Comments
System
Originally posted by Bob Schmid
Robb,
In order to solve our symlink issue with adv security and also to take a smaller/simpler" step to get there as opposed to 6.2.1......I think we are going to try to upgrade to 612 in the near term.
Running AIX 6.1.9
Any implications gotchas in terms of converting:
CL 611 to 612? including considerations for GM and advanced security?
We are running GM 6.1
Main reason to upgrade to 6.1.2 is the following:
Mercy leadership wanting adv security installed ASAP..."ROI"
We use symlinks from one site to another extensively.....which is (as I understand it) not supported by security under cl 611
upgrading to 612 would allow us to continue with symlinks pointing from one regional site to another regional site in Cloverleaf. True?
Would CL 612 w / Advanced security also allow us to point outside of Cloverleaf to different vg's? (not critical but curious to know)
Thanks for your advice.
Bob
System
Originally posted by Bob Schmid
During the period in that we are cl 612 in test and 611 in production...?
Are there any constructs not compatible with each other?
ie Can I cutover a 612 NetConfig to a 611 environment?..or a 612 xlate to a 611 environment
plan would be:
1. install 612 server&client overtop test 611.......testout
..and then install in live. (probably 2-4 weeks)
Bob
jcobane1
Bob,
I think you may run into Client GUI issues when trying to connect a 6.1.2 client to a 6.1.1 server. While the configuration files (Xlate, formats, Tables, etc.) are likely interchangeable/portable, using the Client GUI may be problematic when connecting to a lower versioned server. Just my $.02
Jim Cobane
Henry Ford Health System
System
Originally posted by Bob Schmid
....and it is an unfortunate design... 6.1.2 being in same root as 6.1.1...I don't recall this being an issue ever before...in upgrading..it does not give us a technical "path" for first testing and then cutover to prod.
Bottom line...not ready for 6.2
being told 6.1.2 and 6.2 hold resolution to Security shortcomings...ie symlinks...addressed in 612.
Bob