infor.com
concierge
infor u
developer portal
documentation central
customer center
Posts
Categories
Groups
ERPs
CSD
FSM/HRT
LN
M3
Syteline/ CSI
Hubs
Developer
Healthcare
Hospitality
Public Sector
Onboarding
Release Center
CloudSuites
Aerospace & Defense (LN)
Automotive (LN)
Chemicals (M3)
Corporate (FSM/HRT)
Distribution (Sx.e/CSD)
Distribution Enterprise (M3)
Engineering & Construction (LN)
Fashion (M3)
Food & Beverage (M3)
Healthcare (FSM/HRT)
Industrial (Syteline/CSI)
Industrial Enterprise (LN)
Manufacturing (M3)
Public Sector (FSM/HRT)
Solutions
Supply Chain Management (SCM)
Human Capital Management (HCM)
Events
Groups
User Groups
Your Groups
About
Email Community Support
Infor News
Migrated Forums
Home
Clovertech
Clovertech Archive
Cloverleaf
Hardware for Red Hat Linux
jbmclands
We're moving from AIX to Red Hat 9 and newest version, 2022.09.x, and I would like to know how many CPU's and how much memory others are using. The recommendations in the documentation, Cloverleaf Integration Services Hardware/Software Requirements, in not very informative. Our AIX servers are configured with a lot more memory than what is "recommended."
Thanks for any information.
Find more posts tagged with
Clovertech
Comments
Thomas Morris
Hi Jeff,
We made the jump from AIX to RHEL 7.x a few years ago; here are the specs for our server:
CPUs: 8, Memory: 16GB
We're currently running RHEL 7.9.
Our Cloverleaf version is 20.1.0.0 (migrating to the INFOR cloud solution in late spring 2025)
Jason Russell
RHEL 8.10, CIS2022.09.03. 8 CPUs, 32GB of RAM. We're still migrating to the servers. We're debating skipping 9 and going to 10, but it probably depends on the next version support.
RobertKersemakers
We are currently on RHEL 8.10 with CL19.1.2. Test: 4 CPUs and 16 GB RAM; Prod: 8 CPUs and 32 GB RAM.
We also have two RHEL 9.2 environments with CL2022.09.02 in Azure, as we will migrate from SAP to HiX in June 2025. Same specs.
In Azure though we started with smaller specs: 2 CPU and 8 GB RAM for Test en 4 CPU and 16 GB RAM for Prod. But Test wasn't able to start because of the limited resources, so we returned to the specs we have at the moment.