Can I do a mass change to warehouse location ID's on Engineering Masters?
I am using VE 7.0
I have a part that is used in over 100 different Engineering Masters. The requirements changed, and now we have a new part ID.
In the manufacturing window, I went to Edit> Parts> Material req part replace by part used. Input the old part ID, which produced a list of all of the Engineering Masters. I input the new part ID, and then clicked on "Replaced All".
However, the Warehouse Location ID on the planning tab of the material card is blanked out, so the inventory isn't pulling from the correct location. Is there a way that I can make a mass change to all of the warehouse location ID's? Or will I have to open each one individually and manually make the change?
Comments
There are no comments yet