Hello all,
We are in the middle of implementing a new Process in M3, related to Goods Receiving and Putaway.
The basic premise is that prior to actually receiving the goods in PPS300 and the PO is at status 40 (Shipment Advise), we are able to produce a list of expected supplied items.
1) This will assist as sort of a checklist in comparing soon to be received goods (assuming the shipment has already arrived) with what will be part of the putaway process
2) PPS307PF and PPS308PF becomes available AFTER goods are received, and PPS307PF is printed per line.
3) Item labels (might call MMS200MI_PrtItemLabel at some point) will be printed alongside this "Shipment Putaway Slip"
Open to suggestions if we are on the right track, and thank you in advance.
/ARK